| MOQ: | 1 Bag |
| Price: | Negotiable |
| Standard Packaging: | 25kg/bag |
| Delivery Period: | 2-5days |
| Payment Method: | T/T, L/C |
| Supply Capacity: | 50 Tons Per Day |
| Application Temperature | 180~220℃ |
| Einecs No | 201-177-9 |
| Application Method | Screeding, Manual Road Marking Machine |
| Heating Temperature | 180°C-200°C |
| Application Type | Hot Applied |
| Adhesion | Strong Adhesion To Asphalt And Concrete |
| Package | 25kg/Bag, 60 bags/Pallet |
| Shelf Life | 12 Months |
| State | Powder |
| Dry Time | 3-10 minutes |
| MOQ: | 1 Bag |
| Price: | Negotiable |
| Standard Packaging: | 25kg/bag |
| Delivery Period: | 2-5days |
| Payment Method: | T/T, L/C |
| Supply Capacity: | 50 Tons Per Day |
| Application Temperature | 180~220℃ |
| Einecs No | 201-177-9 |
| Application Method | Screeding, Manual Road Marking Machine |
| Heating Temperature | 180°C-200°C |
| Application Type | Hot Applied |
| Adhesion | Strong Adhesion To Asphalt And Concrete |
| Package | 25kg/Bag, 60 bags/Pallet |
| Shelf Life | 12 Months |
| State | Powder |
| Dry Time | 3-10 minutes |