| Brand Name: | HuaQun |
| Model Number: | CPRMP01 |
| MOQ: | 1drum |
| Price: | 25 |
| Delivery Time: | 5-8 Working days |
| Payment Terms: | T/T,L/C,D/A,D/P |
HuaQun cold traffic paint provides a liquid marking option for approved urban lane and edge lines. Select the paint around the road authority's material specification, the pavement condition and the contractor's application equipment.
Urban marking work often combines continuous edges, broken lane lines and junction details. Separating these items in the material schedule helps the contractor calculate painted area and assign the correct color and reflective system to each location.
Cold paint supports a construction sequence using compatible liquid marking equipment. For maintenance work, the enquiry should also identify the existing coating and any locations exposed to concentrated turning or braking. These details help the project team decide whether the proposed grade and planned inspection interval suit the intended service.
A defined line schedule improves the clarity of the material quotation.
Liquid application fits compatible road line marking machinery.
Paint and bead requirements can be coordinated for each marking type.
Confirm the approved layout and isolate the work area. Prepare the pavement and assess old markings before setting the machine's line width and delivery. Check a trial for film thickness and, where required, bead distribution. Complete the measured scope and verify line geometry and specified performance before reopening the area.
| Item | Product Information |
|---|---|
| Product Name | Acrylic Road Marking Paint |
| Product Type | Acrylic-based pavement marking coating |
| Formulation | Water-based or solvent-based, depending on model |
| Appearance | Liquid paint |
| Available Colors | White, Yellow and customized colors, subject to availability |
| Recommended Surfaces | Asphalt and concrete, subject to product specification |
| Application Methods | Spray, brush or roller, depending on formulation |
| Drying Time | Refer to the specific Technical Data Sheet |
| Packaging | Customized packaging available |
| Shelf Life | Refer to product label and Technical Data Sheet |
| Storage | Store in a cool, dry and well-ventilated place, following product instructions |
Cold application removes the need for a thermoplastic melting kettle.
A single component format avoids separate resin and hardener proportioning.
Liquid paint can be organised around individual work areas and later maintenance.
Remove loose material and contamination, then check surface dryness and coating compatibility. Stir the paint and complete a trial line with the selected equipment. Apply the specified wet film thickness and protect the work until the product's traffic release requirement is met. Use the grade-specific safety data sheet for handling and site controls.
Send HuaQun your pavement type, line dimensions, equipment and required quantity to request a suitable grade, current TDS and quotation.