logo
Good price online

products details

Created with Pixso. Home Created with Pixso. Products Created with Pixso.
Cold Road Marking Paint
Created with Pixso. Fast Drying Cold Road Marking Paint for Maintenance Work

Fast Drying Cold Road Marking Paint for Maintenance Work

Brand Name: HuaQun
Model Number: CPRMP01
MOQ: 1drum
Price: 25
Delivery Time: 5-8 Working days
Payment Terms: T/T,L/C,D/A,D/P
Detail Information
Place of Origin:
Guangzhou
Certification:
CE,ISO9001
Product Name:
Cold Paint Road Marking Paint
Color:
White, Medium Yellow, Deep Yellow, Orange-red, Blue,Custom Colors
Application:
For Road Marking
Feature:
Eco-friendly
Non-stick Tire Drying Time (25°C):
10 Minutes
Package:
20-25kg Iron Drum
Raw Material:
Hydrocarbon Resin
Packaging Details:
Drum
Supply Ability:
5000 drum per day
Highlight:

fast drying cold road marking paint

,

cold road marking paint for maintenance

,

maintenance cold road marking paint

Product Description

HuaQun fast drying cold road marking paint is a material option for maintenance teams working within limited access windows. Select the grade and application schedule together so that preparation, painting and traffic release fit the available work period.

Plan the maintenance window around a defined drying requirement

A small repainting job can still affect a busy entrance or operating car park. Cold paint allows the contractor to organise compatible liquid marking equipment around individual work sections, without setting up a thermoplastic melting stage for each task.

The drying information used for planning should describe the actual test condition and what the result means. Surface dry, ready to recoat and ready for traffic are different milestones. Connecting these requirements to the approved film thickness gives the site operator a clearer basis for scheduling access and deciding when each section can return to use.

Product details
Field Product information
Brand HuaQun
System Bead-compatible cold paint plus drop-on glass beads
Color White or yellow as specified
Bead selection Size and surface treatment matched to the paint
Application rate Set by the approved paint and bead specification
Film thickness Match the selected bead and coating system
Visibility assessment Project-specified retroreflectivity method and conditions
Supply scope Confirm whether paint and beads are quoted separately
Product advantages

Cold application removes the need for a thermoplastic melting kettle.

A single component format avoids separate resin and hardener proportioning.

Liquid paint can be organised around individual work areas and later maintenance.

Application notes

Remove loose material and contamination, then check surface dryness and coating compatibility. Stir the paint and complete a trial line with the selected equipment. Apply the specified wet film thickness and protect the work until the product's traffic release requirement is met. Use the grade-specific safety data sheet for handling and site controls.

Request product information

Send HuaQun your pavement type, line dimensions, equipment and required quantity to request a suitable grade, current TDS and quotation.